AIS Integral supplies ContraFlex® for structural steel skirts project at Petrochemical Plant
In a project where safety compliance and robust fire protection were critical, our customer faced a unique challenge, compounded by the presence of complex geometries.
AIS Integral stepped in to deliver a tailored solution, supplying ContraFlex® covers for application on structural steel skirts at a petrochemical plant in Pennsylvania, USA.

The highlights
120-minute jet fire protection
Our team installed 12 passive fire protection (PFP) removable soft covers with JF-120.
Seamless installation
ContraFlex® blankets/covers were simple to install and will be easy to remove and replace for maintenance purposes.
Customer satisfaction
The customer was highly satisfied, stating "They fit perfectly."

Solution
AIS Integral provided 12 removable soft covers with JF-120 PFP, designed specifically to fit the existing steel skirts.
Despite the complex geometries involved, the covers were fabricated and installed to ensure a seamless fit, perfectly in-line with the customers requirements. On top of this, they offer reliable fire protection and easy removal for maintenance.

Results
Thanks to the expertise of our team, the installation of ContraFlex® PFP covers was executed seamlessly, ensuring a precise and secure fit. The customer was highly satisfied with the quality, and all safety standards and project requirements were fully met.
With a proven track record in industrial applications worldwide, ContraFlex® covers provide a dependable, field-tested solution the customer can trust.
"They are an excellent fit" - customer Superintendent.